DrivewayIQ Team28 May 2026· Updated 15 August 20266 min read

In Queensland a residential driveway should be no steeper than 1 in 5, which is 20%, or about 11 degrees. Up to 1 in 4 (25%, about 14 degrees) is allowed under the Queensland Development Code, but only if the steep part stays short and is eased at both ends.

That's the short answer, and for most blocks it is all you need. The rest of this page covers why the maximum is rarely what causes the failure, because a driveway can sit under every limit and still ground a car.

The short answer

Builders say ratios, homeowners say percentages, spec sheets sometimes say degrees. Same thing.

The gradients this page turns on
RatioPercentageDegreesWhere it comes up
1 in 425%14.0°Steepest allowed in Queensland, and only for a short run
1 in 520%11.3°The standard maximum for a residential driveway
1 in 812.5%7.1°The transition grade at the ends of a steep section

A bigger second number means a flatter driveway. The full set of conversions, including 1 in 6 and 1 in 20, is in how steep can a driveway be.

1 in 5 is the ordinary limit, and 1 in 4 the concession with conditions.

What the Queensland rules actually say

NMP 1.1 of the Queensland Development Code gives two acceptable solutions rather than one limit.

The two acceptable solutions under QDC NMP 1.1
Acceptable solution 1Acceptable solution 2
Maximum gradient1 in 5 (20%)1 in 4 (25%)
Length steeper than 1 in 5Not applicable6 m maximum
Transition at each endNot requiredNot steeper than 1 in 8
Minimum transition lengthNot applicable1 m

Summarised from NMP 1.1 as published. NMP 1.1 is a non-mandatory part of the code — see the section on councils below, and the disclaimer at the foot of this article.

The second is the one people quote incorrectly. The 6 m cap and the transition at each end are conditions of the 1 in 4, not optional extras.

Why transitions matter more than the maximum

A car doesn't scrape because a driveway is steep. It scrapes because the slope changes faster than the car's underside can follow.

Easing that change over a metre or more at each end is what the transition rule is for. See what 1 in 8 actually means.

NMP 1.1's performance requirement says as much: a vehicle should travel the driveway without scraping, scratching or being damaged. The numbers are the certifier's test; the vehicle is the owner's, on moving day.

More in why rate of grade change matters and why your car scrapes.

Where AS/NZS 2890.1 fits

AS/NZS 2890.1 is the Australian and New Zealand off-street parking standard, and its residential access provisions are the other document a certifier may have open. It sits outside the Queensland Development Code, and the two aren't identical.

Whichever one your approval cites is the document to design to, staying within the tighter of the two where they differ.

What your council may require on top

NMP 1.1 is a non-mandatory part of the code. Councils still reference it, and certifiers use it as the yardstick when nothing more specific applies, but it stays guidance, not a statutory requirement.

A planning scheme, a council standard drawing, or a condition on your approval can require something different. The strip between kerb and boundary is usually a council-owned vehicle crossing, built to the council's drawing rather than NMP 1.1.

We have read what each south east Queensland council publishes and written it up separately, because the differences are real.

  • Brisbane publishes its own figures, and its rate-of-change limit is tighter than the state code
  • Gold Coast dimensions the crossing on a drawing that takes precedence over NMP 1.1
  • Moreton Bay publishes four drawings, and only one covers a house
  • Logan lets you skip the application entirely if you pass its checklist
  • Sunshine Coast sorts every crossover into standard or non-standard
  • Redland requires a permit for every crossover, with no self-assessment path
  • Toowoomba requires no approval at all, provided you avoid a published list
  • Ipswich uses none of the drawings its neighbours use, so their figures do not carry across

How to check a driveway

Same process whether it's poured or still on paper:

  1. Get the two end levels. The reduced level (RL) at the street boundary and the finished floor level of the garage. On a new build these come off the site plan; on an existing driveway, measure them.
  2. Work out the overall grade. Total rise or fall divided by total length. A 1.5 m rise over 8 m is 1 in 5.3, inside the ordinary limit.
  3. Find the steepest section. The average grade can comply while a section in the middle doesn't, and that section governs.
  4. Measure the steep run. Any part steeper than 1 in 5 must stay within 6 m to use the 1 in 4 concession.
  5. Check both transitions. At each end of the steep section, look for at least 1 m of easing at no steeper than 1 in 8.

Boundary RL to garage RL covers setting these levels on a design. If it's already poured and grounding cars, read what getting it wrong costs.

Common questions

How steep can a driveway be in Queensland?

No steeper than 1 in 5 (20%). Up to 1 in 4 (25%) where the section steeper than 1 in 5 stays within 6 m. It also needs a transition of at least 1 m, no steeper than 1 in 8, at each end.

Why does my car scrape even though the driveway passes?

An abrupt change in grade rather than the grade itself, usually where the driveway meets the street or the garage floor. A long front overhang or low clearance finds a sharp transition a higher car rides through.

Is 1 in 8 a limit on how much the grade can change per metre?

No — the most common misreading. The 1 in 8 is the steepness of the transition at each end of a steep section; the 1 m is how long that transition must run.

Who is responsible for the section across the footpath?

Usually a council-owned vehicle crossing, not your driveway, built to the council's standard drawing. Who owns the crossover varies by council.

Do these rules apply outside Queensland?

No. Other states work from their own codes and from AS/NZS 2890.1, so the figures aren't interchangeable.

Disclaimer

This article is general information, not advice. It summarises QDC NMP 1.1 as published rather than reproducing it, and it does not reproduce AS/NZS 2890.1, which is copyright to Standards Australia. NMP 1.1 is a non-mandatory part of the Queensland Development Code; local planning schemes, council standard drawings and conditions on individual approvals may impose different or additional requirements. Confirm the requirements applying to your project with the relevant council or a qualified certifier before relying on anything here.