Skip to main content

PreviewDrivewayIQ hasn’t launched — accounts and subscriptions aren’t open yet.

DrivewayIQ
Council Requirements

Redland Driveways: A Permit Is Always Required

DrivewayIQ Team30 July 2026· Updated 15 August 20263 min read

Redland takes a stricter line than most of its neighbours. Where Logan and the Sunshine Coast let you self-assess, Redland wants a permit for every domestic driveway crossover, whether it is new, modified or replaced.

There is a fair bit to get through. Eleven setback distances, a width table keyed to frontage, and obligations that carry on long after the concrete has cured. Checked 15 August 2026 against the council's Domestic driveways and crossovers page.

Eleven setbacks, and all of them apply

Miss one and the crossover is not compliant:

Redland driveway crossover setbacks
Clear ofDistance
Intersection taper point6 m
Existing street trees2 m
Electrical pillar1.1 m
Stormwater pit1 m
Power or light poles1 m
Property boundary0.7 m
Street signs0.5 m
Water service0.3 m
Council service or other utility infrastructure0.3 m
Uninterrupted kerb approaching a bus stop10 m minimum

From Redland City Council's published requirements, checked 15 August 2026.

The 0.7 m boundary setback applies at both sides, which catches narrow lots.

W1, W2 and the 50% frontage rule

W1 is the maximum width at the kerb invert including splays, and W2 the maximum at the property boundary.

Driveway crossover widths, single dwelling house
FrontageCrossingsW1 (at kerb)W2 (at boundary)
10 m or shorter14.5 m3.5 m
10 m to 20 m16.0 m5.0 m
20 m or longer26.0 m5.0 m
Garage or carport on front boundary17.0 m6.0 m

On a frontage of 10 m or shorter, W1 must not exceed 50% of the total lot frontage. Two crossovers require a minimum 6 m between them and a maximum combined W2 of 9.0 m. Duplex rows omitted — see the council's table.

Miss the setbacks or the widths and it's an operational works approval from Council's Engineering and Assessment team, not a driveway permit.

The 900 mm the permit attaches to

With concrete kerb and channel, the crossover is the 900 mm deep section of the driveway where the kerb is cut. Where there's no kerb or pipe crossing, it runs from the road edge to the private property edge of the roadside table drain.

That's council land. See crossover or driveway.

Tree roots, soil drop-off, and what stays yours

Redland lists the owner's obligations in unusual detail:

  • Repairs where tree roots damage the driveway
  • Any damage or breakage to the driveway
  • Soil drop-off at the driveway edge
  • Damage to the kerb and channel near or in front of the driveway
  • Ensuring the driveway is not a hazard to anyone using the council-managed footpath or verge
  • Public liability for injury or property damage caused by the owner

During construction the owner also has to locate services before digging, dowel concrete adjoining existing footpath or kerb, and restore any kerb, channel or open drain disturbed.

Gradients: the one thing this page will not tell you

The page states no gradient figures, so grades and slopes come from the council reference drawing for your frontage.

A driveway off a state-controlled road needs Department of Transport and Main Roads permission as well. See driveway gradients in Queensland.

Disclaimer

General information, not advice. Summarised from Redland City Council's published Domestic driveways and crossovers page as at 15 August 2026, not reproduced. Setbacks, widths and requirements are revised from time to time and individual sites may attract additional conditions. Confirm current requirements with Redland City Council before designing or building.

Create your next driveway profile with DrivewayIQ.

Start Free Trial