Skip to main content

PreviewDrivewayIQ hasn’t launched — accounts and subscriptions aren’t open yet.

DrivewayIQ.
Council Requirements

Sunshine Coast Driveways: Standard, or Non-Standard?

DrivewayIQ Team15 August 20264 min read

Sunshine Coast Council splits driveways into two outcomes: standard, which you may build, and non-standard, which may need council approval. A published crossover checklist is what decides which you have.

Checked 15 August 2026 against the council's Build a driveway page.

The checklist decides

Work through the council's crossover checklist. Answer yes to every question and your crossover meets the standard conditions, and you can commence construction. Answer no to any question and it is non-standard, and you may need to apply for council approval.

Industrial and commercial crossovers require council approval regardless.

The drawings named

For residential driveways the council names IPWEA standard drawings RS-049, RS-050 and RS-056. Use the rural design — RS-056 — where there is no kerb and channel at the proposed location.

The profile and construction notes on RS-049 and RS-050 are covered in detail in the Gold Coast article; they are the same sheets.

You own more of it than you think

No gradient figures on the page

The council's driveway page states no gradient, width or clearance measurements — it directs readers to the standard engineering drawings for dimensions. Take the figures from the drawing that applies, not from another council's.

For the state-level position see driveway gradients in Queensland.

Disclaimer

General information, not advice. Summarised from Sunshine Coast Council's published Build a driveway page as at 15 August 2026, not reproduced. The checklist and the standard drawings are the operative documents and are revised from time to time. Confirm current requirements with Sunshine Coast Council before designing or building.

Create your next driveway profile with DrivewayIQ.

Start Free Trial